Christian Malford Ground Frame: Difference between revisions
Jump to navigation
Jump to search
(Page created) |
(No difference)
|
Revision as of 15:51, 18 August 2014
This GF was installed under Stage 2 of the Swindon MAS scheme on 4th December 1966.
It controlled a trailing crossover between the main lines and was protected by DM.89 and UM.90 (semi-automatic).