Christian Malford Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Page created)
(No difference)

Revision as of 15:51, 18 August 2014

This GF was installed under Stage 2 of the Swindon MAS scheme on 4th December 1966.

It controlled a trailing crossover between the main lines and was protected by DM.89 and UM.90 (semi-automatic).