DM.69 was a automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | |||
Controlled passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | |||
==Conversion to Automatic== | |||
This signal was planned to be converted to an automatic (from what?) on 2 August 1970: | This signal was planned to be converted to an automatic (from what?) on 2 August 1970: | ||
Revision as of 17:16, 5 August 2014
Link back to Control Functions.
Origin
DM.69 was a automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Conversion to Automatic
This signal was planned to be converted to an automatic (from what?) on 2 August 1970:
But the work did not take place as planned:
and the signal was actually converted to automatic on 6 September of that year.
The signal is shown as already an automatic in the resignalling notice S.2489, so unknown what it was converted to an automatic from...