DM.68: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Origins Added)
No edit summary
Line 16: Line 16:


And latterly back to an automatic.
And latterly back to an automatic.
==References==
<references />

Revision as of 17:15, 5 August 2014

Link back to Control Functions.

Origin

DM.68 was a semi-automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB. It was the protecting signal for Knighton Level Crossing on the Down Main. It was semi-automatic and fitted with an emergency replacement switch.

Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.

Conversion to Controlled

It became SN.16 on 2 August 1970.

SN Won AKOverton-1.jpg

Conversion to Automatic

And latterly back to an automatic.


References

  1. Signalling Notice S.2498