Ashbury: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Addition of signal box information)
No edit summary
Line 1: Line 1:
==Signal Box==
==Signal Box==


The mechanical signal box at Ashbury was taken out of use under [[Swindon MAS Stage 1]], 12 November 1966<ref>[[S.2498]]</ref>.
The mechanical signal box at Ashbury was taken out of use under [[Swindon MAS Stage 1]], 12 November 1966<ref name="S.2498">[[S.2498]]</ref>.


==Level Crossing==
==Level Crossing==


The level crossing was temporarily closed at the introduction of [[Swindon MAS Stage 1]], pending conversion to AHB<ref>[[S.2498]]</ref>.
The level crossing was temporarily closed at the introduction of [[Swindon MAS Stage 1]], pending conversion to AHB<ref name="S.2498" />.


The crossing was closed with the raising of the line speed at the time of the introduction of HST.
The crossing was closed with the raising of the line speed at the time of the introduction of HST.


<references />
<references />

Revision as of 16:40, 5 August 2014

Signal Box

The mechanical signal box at Ashbury was taken out of use under Swindon MAS Stage 1, 12 November 1966[1].

Level Crossing

The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[1].

The crossing was closed with the raising of the line speed at the time of the introduction of HST.

  1. 1.0 1.1 S.2498