Research Guidance - Ground Frames: Difference between revisions
Jump to navigation
Jump to search
m (Link back requirement added.) |
m (Link back added) |
||
Line 1: | Line 1: | ||
Articles about [[Ground_Frames|ground frames]] should aim to include as much of the following as possible: | Articles about [[Ground_Frames|ground frames]] should aim to include as much of the following as possible: | ||
The top of the page should have a link back to the [[ | The top of the page should have a link back to the [[Ground Frames|list of Ground Frames]]. | ||
* Description of the location | * Description of the location |
Revision as of 12:28, 20 May 2014
Articles about ground frames should aim to include as much of the following as possible:
The top of the page should have a link back to the list of Ground Frames.
- Description of the location
- Description of the track layout controlled
- Description of the physical characteristics of the frame:
- Number of levers
- Type of locking
- Release arrangements (number, which signal box)
- Key configuration
- List of lever descriptions (referencing lever leads if available)
- Date opened
- Date controlled onto Swindon Panel (if the frame pre-dates the panel)
- Date taken out of use
- (If dates not available, then dates known to be in existence, or not in existence)