Down Yard Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
Back to [[Ground Frames]]
Back to [[Control Functions]] | Back to [[Ground Frames|list of Ground Frames]]


==Origin==
==Origin==

Latest revision as of 02:23, 7 January 2017

Back to Control Functions | Back to list of Ground Frames

Origin

The ground frame was provided when control was required over the (existing) connection from the Down Yard into the Down Reception, when the latter lines was converted to a Down Goods and signalled between 1 and 8 May 1976[1]

Other notes

K2 entry for safe-keeping:

WON-2000-02.png

References

  1. Signalling Notice 43/W/2722