Chippenham East Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Back to list of [[Ground Frames]]
Back to [[Control Functions]] | Back to [[Ground Frames|list of Ground Frames]]


==Existence==
==Existence==
Line 25: Line 25:
The siding connection, worked from the GF, was removed in July 1984.
The siding connection, worked from the GF, was removed in July 1984.


[[File: 1984-01.png]]
[[File: 1984-01.png|border]]


GPL [[SN.284]] was removed at the same time.
GPL [[SN.284]] was removed at the same time.


The ground frame having nothing level to control, it is presumed this is the date it was recovered.
The ground frame having nothing left to control, it is presumed this is the date it was recovered.

Latest revision as of 02:22, 7 January 2017

Back to Control Functions | Back to list of Ground Frames

Existence

Show on maps in this WON entry relating to the remodelling of Thingley Junction in 1975:

1975-01.png

1975-01-diagram.png

Removal of Crossover

The crossover in the main lines, work from this GF, were removed in April 1975:

1975-03.png

Conversion to 3-lever

The ground frame was converted to three levers, in December 1978:

1978-08.png

Removal of Siding Connection

The siding connection, worked from the GF, was removed in July 1984.

1984-01.png

GPL SN.284 was removed at the same time.

The ground frame having nothing left to control, it is presumed this is the date it was recovered.