Ashbury Up Siding Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Detail added)
 
No edit summary
 
Line 1: Line 1:
Back to [[Control Functions]] | Back to [[Ground Frames|list of Ground Frames]]
The ground frame controlled a trailing siding connection in the Up Main. It was protected by semi-automatic signal [[UM.71]].
The ground frame controlled a trailing siding connection in the Up Main. It was protected by semi-automatic signal [[UM.71]].



Latest revision as of 02:20, 7 January 2017

Back to Control Functions | Back to list of Ground Frames

The ground frame controlled a trailing siding connection in the Up Main. It was protected by semi-automatic signal UM.71.

It was installed under Swindon MAS Stage 1 on 12 November 1966[1] and was released by Uffington signal box.

When Uffington SB closed at control over the release passed to Swindon Panel in Swindon MAS Stage 5.