Swindon Yards: Difference between revisions
Jump to navigation
Jump to search
(Page created) |
(No difference)
|
Latest revision as of 11:41, 6 June 2014
There are yards on both sides of the line east of Swindon. Latterly the down side hard has been used as a base for Network Rail's high-output electrification train, which udnertakes piling, mast erection and wiring for the Great Western Electrification Programme.