Goods Yard Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
Line 9: Line 9:
==Removal==
==Removal==


The connection was shown as being taken out of use altogether in December 1992:
The connection was shown as being removed altogether in December 1992:


[[File: 1992-05.png | border]]
[[File: 1992-05.png | border]]

Revision as of 22:42, 15 November 2014

Back to Control Functions

P-way Alterations

The single-slip in the Up Main was replaced with two separate point ends in 1971:

1971-02.png

Removal

The connection was shown as being removed altogether in December 1992:

1992-05.png