==Taking out of use==
==Removal==


The main-main crossover at Rushey Platt was recovered in 1976, and SN.211 was made inoperative, as it had no routes remaining.
The main-main crossover at Rushey Platt was recovered in 1976, and SN.211 was made inoperative, as it had no routes remaining.

Latest revision as of 14:08, 15 November 2014

Back to Control Functions

Removal

The main-main crossover at Rushey Platt was recovered in 1976, and SN.211 was made inoperative, as it had no routes remaining.

1976-04.png

The connection to the MSJ sidings was removed in 1977, along GPL SN.211.