DM.80: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
[[File: 1974-01.png | border]] | [[File: 1974-01.png | border]] | ||
==Removal== | |||
Over the weekend 3-5 May 1977 the signal was removed as part of the re-spacing of signals between Swindon and Wootton Bassett. SN.50 was moved further from Swindon, as was the next signal [[DM.79]]. DM.80 was removed, leaving one fewer signal section overall. | |||
[[File: 1977-11.png|border]] |
Latest revision as of 14:00, 15 November 2014
Back to Control Functions
Conversion from semi-automatic to automatic
The signal was converted from semi-automatic to automatic when Hay Lane Ground Frame was recovered in January 1974.
Removal
Over the weekend 3-5 May 1977 the signal was removed as part of the re-spacing of signals between Swindon and Wootton Bassett. SN.50 was moved further from Swindon, as was the next signal DM.79. DM.80 was removed, leaving one fewer signal section overall.