DM.79: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created page with "Back to Control Functions ==Origin== ... ==Alterations== Over the weekend 3-5 May 1977 the signal was moved as part of the re-spacing of signals between Swindon and Wo...")
 
Line 9: Line 9:
Over the weekend 3-5 May 1977 the signal was moved as part of the re-spacing of signals between Swindon and Wootton Bassett. DM.79 was moved further from Swindon and onto the new gantry recently installed and already carrying [[UM.79]].
Over the weekend 3-5 May 1977 the signal was moved as part of the re-spacing of signals between Swindon and Wootton Bassett. DM.79 was moved further from Swindon and onto the new gantry recently installed and already carrying [[UM.79]].


The signal in rear, [[SN.50]], was also moved further from Swindon.
The signal in rear, [[SN.50]], was also moved further from Swindon and the next signal, [[DM.80]] was recovered. DM.79 now breaking the section between SN.50 and DM.81.


[[File: 1977-11.png|border]]
[[File: 1977-11.png|border]]

Revision as of 13:49, 15 November 2014

Back to Control Functions

Origin

...

Alterations

Over the weekend 3-5 May 1977 the signal was moved as part of the re-spacing of signals between Swindon and Wootton Bassett. DM.79 was moved further from Swindon and onto the new gantry recently installed and already carrying UM.79.

The signal in rear, SN.50, was also moved further from Swindon and the next signal, DM.80 was recovered. DM.79 now breaking the section between SN.50 and DM.81.

1977-11.png