SN.53: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created page with "Back to Control Functions ==Alterations in connection with Reversible Signalling== From 6 November 1977 the signal was mounted on a right-hand cantilever, in readiness f...")
 
No edit summary
Line 8: Line 8:


The reversible signalling was brought into use in 1980 <ref>Signalling Notice [[31/2767]]</ref>.
The reversible signalling was brought into use in 1980 <ref>Signalling Notice [[31/2767]]</ref>.
==References==
<references/>

Revision as of 13:24, 15 November 2014

Back to Control Functions

Alterations in connection with Reversible Signalling

From 6 November 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of SN.653 on the same structure.

1977-10.png

The reversible signalling was brought into use in 1980 [1].

References

  1. Signalling Notice 31/2767