UM.68: Difference between revisions
Jump to navigation
Jump to search
(Number of aspects added) |
No edit summary |
||
(4 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
UM.68 was a 3-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | UM.68 was a 3-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB. | ||
{{Template:LastNextSignals | |||
|LastSignal=[[UM.69]] | |||
|LastSignalLine=Up Main | |||
|NextSignalLine=Up Main | |||
|NextSignal=[[UF.22]] | |||
}} | |||
Supervision passed to Swindon Panel under [[Swindon MAS Stage 5]] on 3rd March 1968. | |||
{{Template:LastNextSignals | |||
|LastSignal=[[UM.69]] | |||
|LastSignalLine=Up Main | |||
|NextSignalLine=Up Main | |||
|NextSignal=[[SN.89]] | |||
}} | |||
==Alterations in connection with Reversible Signalling== | |||
From 19 June 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of [[SN.693RR]] on the same structure. | |||
[[File: 1977-05.png|border]] | |||
==Conversion to four-aspect== | |||
When [[SN.93]] was brought into use over the weekend of 22-24 October 1977, further in connection with the installation of reversible signalling, UM.68 was converted to a four-aspect, as there was the insufficient braking distance between [[SN.89]] and [[SN.93]]. | |||
[[File: 1977-09.png|border]] | |||
The reversible signalling was brought into use in 1981 <ref>Signalling Notice [[31/W/2770]]</ref>. | |||
==References== | ==References== | ||
<references/> | <references/> |
Latest revision as of 13:19, 15 November 2014
Origin
UM.68 was a 3-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UM.69 | Up Main | Up Main | UF.22 |
Supervision passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.
Previous Signal | Line | Line | Next Signal |
---|---|---|---|
UM.69 | Up Main | Up Main | SN.89 |
Alterations in connection with Reversible Signalling
From 19 June 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of SN.693RR on the same structure.
Conversion to four-aspect
When SN.93 was brought into use over the weekend of 22-24 October 1977, further in connection with the installation of reversible signalling, UM.68 was converted to a four-aspect, as there was the insufficient braking distance between SN.89 and SN.93.
The reversible signalling was brought into use in 1981 [2].