==Origin==
==Origin==


...


...
==Bridge Works==
 
During works on Stratton bridge (74m 75c) in 1975, an emergency replacement switch was fitted to this signal.


==Removal==
==Removal==

Revision as of 15:56, 9 November 2014

Back to Control Functions.


Origin

...

Bridge Works

During works on Stratton bridge (74m 75c) in 1975, an emergency replacement switch was fitted to this signal.

Removal

This signal was planned to be removed on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.

WON-2000-03.png

It was later planned to be removed on 11 February 2002, as described in GWS.27:

WON-2002-06.png

and

WON-2002-03.png

but wasn't until 18 February 2002....