DM.74: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
==Origin== | ==Origin== | ||
... | |||
==Bridge Works== | |||
During works on Stratton bridge (74m 75c) in 1975, an emergency replacement switch was fitted to this signal. | |||
==Removal== | ==Removal== |
Revision as of 15:56, 9 November 2014
Back to Control Functions.
Origin
...
Bridge Works
During works on Stratton bridge (74m 75c) in 1975, an emergency replacement switch was fitted to this signal.
Removal
This signal was planned to be removed on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.
It was later planned to be removed on 11 February 2002, as described in GWS.27:
and
but wasn't until 18 February 2002....