Knighton: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Signal Box Information Added)
(Closure of LC added)
 
Line 7: Line 7:
The level crossing was temporarily closed at the introduction of [[Swindon MAS Stage 1]], pending conversion to AHB<ref name="S.2498" />.
The level crossing was temporarily closed at the introduction of [[Swindon MAS Stage 1]], pending conversion to AHB<ref name="S.2498" />.


The crossing was closed with the raising of the line speed at the time of the introduction of HST.
The crossing was closed with the raising of the line speed at the time of the introduction of HSTs. The undated WON entry first appeared in WON 26, January 1974:
 
[[File: 1974-02.png | border]]
 
 


<references />
<references />

Latest revision as of 13:46, 9 November 2014

Signal Box

The mechanical signal box at Knighton was taken out of use preliminary to Swindon MAS Stage 1, between 0700 and 0800 on Saturday 12 November 1966[1].

Level Crossing

The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[1].

The crossing was closed with the raising of the line speed at the time of the introduction of HSTs. The undated WON entry first appeared in WON 26, January 1974:

1974-02.png


  1. 1.0 1.1 S.2498