==Signal Box== | |||
The mechanical signal box at Knighton was taken out of use preliminary to [[Swindon MAS Stage 1]], between 0700 and 0800 on Saturday 12 November 1966<ref name="S.2498">[[S.2498]]</ref>. | |||
==Level Crossing== | |||
The level crossing was temporarily closed at the introduction of [[Swindon MAS Stage 1]], pending conversion to AHB<ref name="S.2498" />. | |||
The crossing was closed with the raising of the line speed at the time of the introduction of HSTs. The undated WON entry first appeared in WON 26, January 1974: | |||
[[File: 1974-02.png | border]] | |||
<references /> |
Latest revision as of 13:46, 9 November 2014
Signal Box
The mechanical signal box at Knighton was taken out of use preliminary to Swindon MAS Stage 1, between 0700 and 0800 on Saturday 12 November 1966[1].
Level Crossing
The level crossing was temporarily closed at the introduction of Swindon MAS Stage 1, pending conversion to AHB[1].