SN.260: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created)
(No difference)

Revision as of 13:41, 9 November 2014

Back to Control Functions

Alterations in Connection with the closure of the Diesel MPD

In November 1972 when the connections to the Diesel MPD were recovered, this signal's route towards GPL SN.264 was altered to read towards the new Limit of shunt that replaced it.

1972-01.png