Thingley Up Sidings Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Created)
(No difference)

Revision as of 22:25, 24 August 2014

For sake keeping:


Description

This ground frame controls the trailing connection in the Up Main from Thingley Sidings.

The frame is released from Swindon Panel.

The ground frame was originally mechanical, but converted to motor operation at 05.35 on Monday 8 June 2009.

WON-2009-02.png