The red aspect was later planned to be brought into use on 18 February 2002, as described in [[GWS.27]]:
The red aspect was later planned to be brought into use on 18 February 2002, as described in [[GWS.27]]:


[[File:WON-2002-02.png | border]]
[[File:WON-2002-06.png | border]]


and
and

Latest revision as of 16:45, 24 August 2014

Back to Control Functions.

This signal shared a cantilever structure with UM.73.

Conversion to Controlled

The signal was converted from a 2-aspect (yellow/green) head to a 3-aspect (red/yellow/green) head at 0700 on 30 September 2001, although the red aspect was not brought into use.

WON-2001-01.png

The red aspect was planned to be brought into use and the signal re-numbered SN.681 on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.

WON-2000-03.png

The red aspect was later planned to be brought into use on 18 February 2002, as described in GWS.27:

WON-2002-06.png

and

WON-2002-03.png

but wasn't until 4 March 2002....

WON-2002-04.png