SN.683R: Difference between revisions
Jump to navigation
Jump to search
m (Border added) |
No edit summary |
||
Line 2: | Line 2: | ||
[[File:WON-2001-01.png | border]] | [[File:WON-2001-01.png | border]] | ||
==Conversion to Controlled== | |||
The red aspect was planned to be brought into use and the signal re-numbered [[SN.681]] on 7 February 2000, as described in [[GWS.15]], but, due to 'construction difficulties' the work did not take place. | |||
[[File:WON-2000-03.png | border]] | |||
The red aspect was later planned to be brought into use on 18 February 2002, as described in [[GWS.27]]: | |||
[[File:WON-2002-02.png | border]] | |||
and | |||
[[File:WON-2002-03.png | border]] | |||
but wasn't until 4 March 2002.... | |||
[[File:WON-2002-04.png | border]] |
Revision as of 13:20, 24 August 2014
This signal was converted from a 2-aspect (yellow/green) head to a 3-aspect (red/yellow/green) head at 0700 on 30 September 2001, although the red aspect was not brought into use.
Conversion to Controlled
The red aspect was planned to be brought into use and the signal re-numbered SN.681 on 7 February 2000, as described in GWS.15, but, due to 'construction difficulties' the work did not take place.
The red aspect was later planned to be brought into use on 18 February 2002, as described in GWS.27:
and
but wasn't until 4 March 2002....