Uploads by Daniel Evans
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
21:38, 16 July 2014 | Aspect Sequence Up Main.pdf (file) | 1.82 MB | Up Main Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
21:40, 16 July 2014 | Aspect Sequence Down Main.pdf (file) | 1.48 MB | Down Main Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
21:41, 16 July 2014 | Aspect Sequence Up Badminton.pdf (file) | 1.08 MB | Up Badminton Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
21:42, 16 July 2014 | Aspect Sequence Up Gloucester.pdf (file) | 1.14 MB | Up Gloucester Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
21:42, 16 July 2014 | Aspect Sequence Down Gloucester.pdf (file) | 1.06 MB | Down Gloucester Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
21:42, 16 July 2014 | Aspect Seauence Down Badminton.pdf (file) | 1.11 MB | Down Badminton Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
22:02, 16 July 2014 | Stage 1 Works Instructions.pdf (file) | 3.84 MB | Detailed arrangements for staff and equipment involved in Stage 1 of Swindon MAS | 1 | |
22:07, 16 July 2014 | Stage 3 Works Instructions.pdf (file) | 3.61 MB | Detailed arrangements for staff and equipment involved in Stage 3 of Swindon MAS | 1 | |
22:10, 16 July 2014 | Stage 5 Works Instructions.pdf (file) | 6.44 MB | Detailed arrangements for staff and equipment involved in Stage 5 of Swindon MAS | 1 | |
22:15, 16 July 2014 | Stage 6 Notice Requisition.pdf (file) | 2.19 MB | Request for resignalling notice to be published in connection with Stage 6 of Swindon MAS | 1 | |
22:15, 16 July 2014 | Stage 6 Works Instructions.pdf (file) | 4.38 MB | Detailed arrangements for staff and equipment involved in Stage 6 of Swindon MAS | 1 | |
22:23, 16 July 2014 | Cost Letter.pdf (file) | 422 KB | Letter dated 1st June 1965, with a revised estimate for the Swindon MAS costs. | 1 | |
22:25, 16 July 2014 | MAS Scheme information.pdf (file) | 1.13 MB | A short two-page summary of the Swindon MAS scheme, dated 7th Dec 1964. | 1 | |
22:25, 16 July 2014 | MAS Scheme Net Estimate.pdf (file) | 547 KB | A detailed estimate of the Swindon MAS scheme costs, dated 4th June 1965. | 1 | |
22:27, 16 July 2014 | MAS Scheme Programme.pdf (file) | 463 KB | A provisional programme of the Swindon MAS scheme, including rough dates for stages and an estimate for expenditure in 1965. No date given, 1964 or early 1965. | 1 | |
22:29, 16 July 2014 | Redundant Signal Boxes.pdf (file) | 657 KB | A list of signal boxes made redundant by the Swindon MAS Scheme, including type of box and date of construction, and type and date of the frame installed. No date given. | 1 | |
22:36, 16 July 2014 | Remote Controls.pdf (file) | 353 KB | A diagram summarising the remote controls for interlockings of the Swindon MAS Scheme, including distance to interlocking, type of connection, and number of controls and indications at each interlocking. No date given. | 1 | |
22:40, 16 July 2014 | Signalling Scheme Info.pdf (file) | 5.44 MB | A detailed report covering the Swindon MAS Scheme. Includes a background and justification for the scheme and other MAS schemes in the Western Region (including an unbuilt Stoke Gifford panel box), the proposed features of the Swindon MAS scheme, a fin... | 1 | |
22:42, 16 July 2014 | Swindon MAS Index.pdf (file) | 306 KB | An index to a series of documents covering the Swindon MAS proposals. | 1 | |
22:44, 16 July 2014 | MAS Scheme Statistics.pdf (file) | 1.09 MB | Statistics relating to signalling equipment in the Swindon MAS Scheme. Undated. | 1 | |
22:44, 16 July 2014 | Route Lists.pdf (file) | 3.09 MB | A list of signal routes for the initial scheme plan of the Swindon MAS Scheme, detailing destination, route type, and indications given. Dated Aug 1965. | 1 | |
21:09, 18 July 2014 | Deficient Distant Signals.pdf (file) | 249 KB | List of signals with deficient (less than standard) braking distance in the Swindon Panel area. Undated. (7203) | 1 | |
21:10, 18 July 2014 | Envelope to Cardani.pdf (file) | 94 KB | Envelope addressed to A. A. A. Cardani, CS&TE, Western Region. Undated. (7203) | 1 | |
21:12, 18 July 2014 | Estimated Costs.pdf (file) | 515 KB | List of estimated costs for extensions/fringes to the original Swindon MAS scheme scope, including Swindon-Standish Jn, Thingley Jn-Bradford Jn, and Westerleigh Junction. Dated 17/03/65. (7203) | 1 | |
21:14, 18 July 2014 | Letter to Cardani from Westinghouse.pdf (file) | 472 KB | Letter from T J Aldridge of Westinghouse Brake and Signal Co Ltd to Armand Cardani, CS&TE, Western Region, discussing tenders for equipment related to the Swindon MAS Scheme. Dated 08/02/66. (7203) | 1 | |
21:16, 18 July 2014 | Level Crossings Proposed Arrangements.pdf (file) | 307 KB | Document covering the proposed arrangements for level crossings in the Swindon MAS Scheme, an estimate for track circuiting the line between Thingley and Bradford Junctions, and a proposal to fit AWS on the Swindon-Gloucester line. Dated 16/08/65. (7203) | 1 | |
21:18, 18 July 2014 | Progress Meeting 20.pdf (file) | 2.39 MB | The minutes of Swindon MAS Progress Meeting No. 20, held at Reading on 19/09/66. Discusses progress and target dates for the project. (7203) | 1 | |
21:25, 18 July 2014 | SN59 Issues.pdf (file) | 694 KB | Two letters between A.A.A. Cardani, CS&TE (WR), and H C Sanderson, Movements Manager (Paddington), discussing the deficiency in braking distance for signal SN.59, which S&T believes not to be a significant issue, whilst the Traction department believe ... | 1 |