To Do List: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
MEMBERSHIP


* Hand over membership administrator to Dennis [Danny]
'''Items that are in the conference notes system removed from here'''
 


FINANCE
FINANCE


* Charity Registration [Danny - waiting on CC]
* Identify missing Gift Aid forms [Brian]
* Identify missing Gift Aid forms [Brian]
* Follow up Mark Hopwood [Tim M]


PR
PR
Line 15: Line 13:
* Re-design Membership Prospectus / Society Leaflet
* Re-design Membership Prospectus / Society Leaflet
* Source banner [Tim - on hold while we wait for Charity number]
* Source banner [Tim - on hold while we wait for Charity number]
BUILDING
* Volunteer Site Booklet [Tom]


VISITOR INTERPRETATION
VISITOR INTERPRETATION
Line 42: Line 36:


* Finish labelling up Reading Main and Reading Newbury photos. [James N - ''Newbury Done 07/10/2014, Main Panel now in progress'']
* Finish labelling up Reading Main and Reading Newbury photos. [James N - ''Newbury Done 07/10/2014, Main Panel now in progress'']
* Label up Oxford photos. [James N]
* Upload photos of building [Dave M]
* Upload photos of building [Dave M]


PANEL RECREATION
PANEL RECREATION
* Complete Phase 1 Locking Sketch and Domino drawing [Danny]
* Refurbish ground frame cupboard [John M]
* Refurbish ground frame cupboard [John M]
* Engage NR about process for extraction
* Engage scaffolding contractors [Danny]
* Engage scaffolding contractors [Danny]
* Engage jack/skate suppliers [Danny]
* Engage jack/skate suppliers [Danny]
* Engage lifting contractors [Danny]
* Engage lifting contractors [Danny]
* Engage hauliers [Danny]
* Engage hauliers [Danny]
OPERATIONS BOARD
* Complete Phase 1 Locking Sketch and Domino drawing [Danny]
* Check of locking sketch:
** Signal numbers
*** Number of aspects
*** DAs / JIs / SIs
*** Routes
*** Location
*** Distances
** Points
*** Numbers
*** Years of provision
*** Within correct TC
** TCs
*** Identity
*** Correct relative position
*** Length
Sources:
* Yellow Perils from opening
* Locking Sketches 1970s/80s
* Yellow Perils from Reversible Installation (and others)
* Locking Sketches Today
* Track Diagrams
* Drivers' Maps
* HST Sketch
* WONs
(for comparison to SPS locking sketch > simulator)
* Creation of control tables
* Creation of panel Domino diagram
* Identification of 'fringe' requirements for simulator
* Creation of simulation
* Testing of simulation

Latest revision as of 23:11, 17 January 2015

Items that are in the conference notes system removed from here


FINANCE

  • Identify missing Gift Aid forms [Brian]

PR

  • Create 'general' article for magazines etc [Richard]
  • Write to Railway Magazine [Robin W]
  • Re-design Membership Prospectus / Society Leaflet
  • Source banner [Tim - on hold while we wait for Charity number]

VISITOR INTERPRETATION

  • Explanation of relay interlocking [Jon T/ Tim M]
  • Other explanation boards/exhibits
  • Swindon panel visitors guide booklet [Tim M]
  • I-Spy booklet for Didcot signalling

WEBSITE

  • Move remainder of old news items onto new website.
  • Reinstate sign-up-for-details form.
  • Add more panel info, ie, track diagram, etc.

WIKI

  • Put links on all location pages in the Wiki to the photo pages on the Flickr site.
  • Put a photo of each GF/signal/points from the Flickr site on the page for each GF/signal/points in the Wiki.
  • Go over scheme plans and add signal details in.

PHOTO SITE

  • Finish labelling up Reading Main and Reading Newbury photos. [James N - Newbury Done 07/10/2014, Main Panel now in progress]
  • Label up Oxford photos. [James N]
  • Upload photos of building [Dave M]

PANEL RECREATION

  • Refurbish ground frame cupboard [John M]
  • Engage NR about process for extraction
  • Engage scaffolding contractors [Danny]
  • Engage jack/skate suppliers [Danny]
  • Engage lifting contractors [Danny]
  • Engage hauliers [Danny]

OPERATIONS BOARD

  • Complete Phase 1 Locking Sketch and Domino drawing [Danny]
  • Check of locking sketch:
    • Signal numbers
      • Number of aspects
      • DAs / JIs / SIs
      • Routes
      • Location
      • Distances
    • Points
      • Numbers
      • Years of provision
      • Within correct TC
    • TCs
      • Identity
      • Correct relative position
      • Length

Sources:

  • Yellow Perils from opening
  • Locking Sketches 1970s/80s
  • Yellow Perils from Reversible Installation (and others)
  • Locking Sketches Today
  • Track Diagrams
  • Drivers' Maps
  • HST Sketch
  • WONs

(for comparison to SPS locking sketch > simulator)

  • Creation of control tables
  • Creation of panel Domino diagram
  • Identification of 'fringe' requirements for simulator
  • Creation of simulation
  • Testing of simulation