Swindon MAS Stages

From Swindon Panel Reference
Revision as of 21:41, 18 July 2014 by Daniel Evans (talk | contribs) (Additional documents and rearrangement of links)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Stage 1 Uffington to Highworth Junction
Stage 2 Wootton Bassett West to Thingley Junction
Stage 3 Thingley Junction to Bathampton and Bradford Junction
Stage 4 Wootton Bassett West to Badminton
Stage 5 Uffington to Hay Lane and Swindon Loco Yard
Stage 6 Hay Lane to Thingley Junction and Hullavington
Stage 7 Swindon Loco Yard to Kemble

Scheme Planning

Documents relating to the proposals for Swindon MAS.

Scheme information and costings
Planning and scheduling
Scheme details