Swindon MAS Stages

From Swindon Panel Reference
Revision as of 22:50, 16 July 2014 by Daniel Evans (talk | contribs) (Scheme planning documents added)
Jump to navigation Jump to search
Stage 1 Uffington to Highworth Junction
Stage 2 Wootton Bassett West to Thingley Junction
Stage 3 Thingley Junction to Bathampton and Bradford Junction
Stage 4 Wootton Bassett West to Badminton
Stage 5 Uffington to Hay Lane and Swindon Loco Yard
Stage 6 Hay Lane to Thingley Junction and Hullavington
Stage 7 Swindon Loco Yard to Kemble

Scheme Planning

Documents relating to the proposals for Swindon MAS.

Index to a set of documents covering the proposals

A detailed introduction to the scheme and projected cost savings

A brief overview of the scheme

Detailed cost estimated for the scheme

A revised cost estimate, dated 01/06/65

Proposed scheme schedule

Statistics relating to proposed signalling equipment

A list of signalboxes to be made redundant

An overview of remote interlocking controls and communications

Route lists for signals in the initial scheme