Swindon MAS Stages: Difference between revisions
Jump to navigation
Jump to search
m ((7203) added) |
Daniel Evans (talk | contribs) (Additional documents and rearrangement of links) |
||
(One intermediate revision by one other user not shown) | |||
Line 27: | Line 27: | ||
Documents relating to the proposals for Swindon MAS. | Documents relating to the proposals for Swindon MAS. | ||
=====Scheme information and costings===== | |||
*[[Media: | *[[Media:Swindon_MAS_Index.pdf|Index to a set of documents covering the proposals]] (7203) | ||
*[[Media: | *[[Media:Signalling_Scheme_Info.pdf|Detailed introduction to the scheme and projected cost savings]] (7203) | ||
*[[Media: | *[[Media:MAS_Scheme_information.pdf|Brief overview of the scheme]] (7203) | ||
*[[Media: | *[[Media:MAS_Scheme_Net_Estimate.pdf|Detailed cost estimated for the scheme]] (7203) | ||
*[[Media: | *[[Media:Estimated_Costs.pdf|Estimated costs for various additional features, dated 17/03/65]] (7203) | ||
*[[Media: | *[[Media:Cost_Letter.pdf|Revised cost estimate, dated 01/06/65]] (7203) | ||
*[[Media: | *[[Media:Letter_to_Cardani_from_Westinghouse.pdf|Letter from Westinghouse to CS&TE (WR) regarding tenders for equipment]] (7203) | ||
=====Planning and scheduling===== | |||
*[[Media: | *[[Media:MAS_Scheme_Programme.pdf|Proposed scheme schedule]] (7203) | ||
( | *[[Media:Progress_Meeting_20.pdf|Minutes of Progress Meeting 20, held in Reading on 19/09/66]] (7203) | ||
=====Scheme details===== | |||
*[[Media:MAS_Scheme_Statistics.pdf|Statistics relating to proposed signalling equipment]] (7203) | |||
*[[Media:Redundant_Signal_Boxes.pdf|List of signalboxes to be made redundant]] (7203) | |||
*[[Media:Remote_Controls.pdf|Overview of remote interlocking controls and communications]] (7203) | |||
*[[Media:Route_Lists.pdf|Route lists for signals in the initial scheme]] (7203) | |||
*[[Media:Level_Crossings_Proposed_Arrangements.pdf|Proposed arrangements for level crossings]] (7203) | |||
*[[Media:Deficient_Distant_Signals.pdf|List of signals with deficient braking distance]] (7203) | |||
*[[Media:SN59_Issues.pdf|Letters relating to the deficient braking distance on signal SN.59]] (7203) | |||
[[file:SWINDON_MAS_Scheme_Stages.png|600px|thumb|left|[[File:MAS_Schemes.pdf]]]] |
Latest revision as of 21:41, 18 July 2014
Stage 1 | Uffington to Highworth Junction |
Stage 2 | Wootton Bassett West to Thingley Junction |
Stage 3 | Thingley Junction to Bathampton and Bradford Junction |
Stage 4 | Wootton Bassett West to Badminton |
Stage 5 | Uffington to Hay Lane and Swindon Loco Yard |
Stage 6 | Hay Lane to Thingley Junction and Hullavington |
Stage 7 | Swindon Loco Yard to Kemble |
Scheme Planning
Documents relating to the proposals for Swindon MAS.
Scheme information and costings
- Brief overview of the scheme (7203)
Planning and scheduling
- Proposed scheme schedule (7203)