Swindon MAS Stages: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
m (Reworded some links)
m ((7203) added)
Line 46: Line 46:


*[[Media:Route_Lists.pdf|Route lists for signals in the initial scheme]]
*[[Media:Route_Lists.pdf|Route lists for signals in the initial scheme]]
(All 7203)

Revision as of 23:44, 16 July 2014

Stage 1 Uffington to Highworth Junction
Stage 2 Wootton Bassett West to Thingley Junction
Stage 3 Thingley Junction to Bathampton and Bradford Junction
Stage 4 Wootton Bassett West to Badminton
Stage 5 Uffington to Hay Lane and Swindon Loco Yard
Stage 6 Hay Lane to Thingley Junction and Hullavington
Stage 7 Swindon Loco Yard to Kemble

Scheme Planning

Documents relating to the proposals for Swindon MAS.

(All 7203)