Swindon MAS Stages: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
m (Formatting)
m (Reworded some links)
Line 29: Line 29:
*[[Media:Swindon_MAS_Index.pdf|Index to a set of documents covering the proposals]]
*[[Media:Swindon_MAS_Index.pdf|Index to a set of documents covering the proposals]]


*[[Media:Signalling_Scheme_Info.pdf|A detailed introduction to the scheme and projected cost savings]]
*[[Media:Signalling_Scheme_Info.pdf|Detailed introduction to the scheme and projected cost savings]]


*[[Media:MAS_Scheme_information.pdf|A brief overview of the scheme]]
*[[Media:MAS_Scheme_information.pdf|Brief overview of the scheme]]


*[[Media:MAS_Scheme_Net_Estimate.pdf|Detailed cost estimated for the scheme]]
*[[Media:MAS_Scheme_Net_Estimate.pdf|Detailed cost estimated for the scheme]]


*[[Media:Cost_Letter.pdf|A revised cost estimate, dated 01/06/65]]
*[[Media:Cost_Letter.pdf|Revised cost estimate, dated 01/06/65]]


*[[Media:MAS_Scheme_Programme.pdf|Proposed scheme schedule]]
*[[Media:MAS_Scheme_Programme.pdf|Proposed scheme schedule]]
Line 41: Line 41:
*[[Media:MAS_Scheme_Statistics.pdf|Statistics relating to proposed signalling equipment]]
*[[Media:MAS_Scheme_Statistics.pdf|Statistics relating to proposed signalling equipment]]


*[[Media:Redundant_Signal_Boxes.pdf|A list of signalboxes to be made redundant]]
*[[Media:Redundant_Signal_Boxes.pdf|List of signalboxes to be made redundant]]


*[[Media:Remote_Controls.pdf|An overview of remote interlocking controls and communications]]
*[[Media:Remote_Controls.pdf|Overview of remote interlocking controls and communications]]


*[[Media:Route_Lists.pdf|Route lists for signals in the initial scheme]]
*[[Media:Route_Lists.pdf|Route lists for signals in the initial scheme]]

Revision as of 22:59, 16 July 2014

Stage 1 Uffington to Highworth Junction
Stage 2 Wootton Bassett West to Thingley Junction
Stage 3 Thingley Junction to Bathampton and Bradford Junction
Stage 4 Wootton Bassett West to Badminton
Stage 5 Uffington to Hay Lane and Swindon Loco Yard
Stage 6 Hay Lane to Thingley Junction and Hullavington
Stage 7 Swindon Loco Yard to Kemble

Scheme Planning

Documents relating to the proposals for Swindon MAS.