Swindon MAS Stages: Difference between revisions
Jump to navigation
Jump to search
Daniel Evans (talk | contribs) (Scheme planning documents added) |
Daniel Evans (talk | contribs) m (Formatting) |
||
Line 27: | Line 27: | ||
Documents relating to the proposals for Swindon MAS. | Documents relating to the proposals for Swindon MAS. | ||
[[Media:Swindon_MAS_Index.pdf|Index to a set of documents covering the proposals]] | *[[Media:Swindon_MAS_Index.pdf|Index to a set of documents covering the proposals]] | ||
[[Media:Signalling_Scheme_Info.pdf|A detailed introduction to the scheme and projected cost savings]] | *[[Media:Signalling_Scheme_Info.pdf|A detailed introduction to the scheme and projected cost savings]] | ||
[[Media:MAS_Scheme_information.pdf|A brief overview of the scheme]] | *[[Media:MAS_Scheme_information.pdf|A brief overview of the scheme]] | ||
[[Media:MAS_Scheme_Net_Estimate.pdf|Detailed cost estimated for the scheme]] | *[[Media:MAS_Scheme_Net_Estimate.pdf|Detailed cost estimated for the scheme]] | ||
[[Media:Cost_Letter.pdf|A revised cost estimate, dated 01/06/65]] | *[[Media:Cost_Letter.pdf|A revised cost estimate, dated 01/06/65]] | ||
[[Media:MAS_Scheme_Programme.pdf|Proposed scheme schedule]] | *[[Media:MAS_Scheme_Programme.pdf|Proposed scheme schedule]] | ||
[[Media:MAS_Scheme_Statistics.pdf|Statistics relating to proposed signalling equipment]] | *[[Media:MAS_Scheme_Statistics.pdf|Statistics relating to proposed signalling equipment]] | ||
[[Media:Redundant_Signal_Boxes.pdf|A list of signalboxes to be made redundant]] | *[[Media:Redundant_Signal_Boxes.pdf|A list of signalboxes to be made redundant]] | ||
[[Media:Remote_Controls.pdf|An overview of remote interlocking controls and communications]] | *[[Media:Remote_Controls.pdf|An overview of remote interlocking controls and communications]] | ||
[[Media:Route_Lists.pdf|Route lists for signals in the initial scheme]] | *[[Media:Route_Lists.pdf|Route lists for signals in the initial scheme]] |
Revision as of 22:51, 16 July 2014
Stage 1 | Uffington to Highworth Junction |
Stage 2 | Wootton Bassett West to Thingley Junction |
Stage 3 | Thingley Junction to Bathampton and Bradford Junction |
Stage 4 | Wootton Bassett West to Badminton |
Stage 5 | Uffington to Hay Lane and Swindon Loco Yard |
Stage 6 | Hay Lane to Thingley Junction and Hullavington |
Stage 7 | Swindon Loco Yard to Kemble |
Scheme Planning
Documents relating to the proposals for Swindon MAS.