File list
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
22:10, 16 July 2014 | Stage 5 Works Instructions.pdf (file) | 6.44 MB | Daniel Evans | Detailed arrangements for staff and equipment involved in Stage 5 of Swindon MAS | 1 | |
10:49, 15 June 2014 | S2546.pdf (file) | 6.4 MB | Danny | Signalling Notice - S2546 - Swindon Stage 5 | 1 | |
22:48, 5 June 2014 | Swindon Locking Sketch 1979.pdf (file) | 5.74 MB | Danny | BR(W) Swindon Locking Sketch, S296/2, 1979 | 1 | |
12:33, 18 June 2014 | Swindon west.jpg (file) | 5.51 MB | Tim Miller | 1 | ||
22:40, 16 July 2014 | Signalling Scheme Info.pdf (file) | 5.44 MB | Daniel Evans | A detailed report covering the Swindon MAS Scheme. Includes a background and justification for the scheme and other MAS schemes in the Western Region (including an unbuilt Stoke Gifford panel box), the proposed features of the Swindon MAS scheme, a fin... | 1 | |
22:15, 16 July 2014 | Stage 6 Works Instructions.pdf (file) | 4.38 MB | Daniel Evans | Detailed arrangements for staff and equipment involved in Stage 6 of Swindon MAS | 1 | |
23:06, 5 June 2014 | Hullavington Locking Sketch 1983.pdf (file) | 4.04 MB | Danny | BR(W) Hullavington Locking Sketch, S313/2, 1983 | 1 | |
21:57, 5 June 2014 | Wantage Road.pdf (file) | 3.9 MB | Danny | BR(W) Wantage Road Locking Sketch, S163/2, Drawn Dec 74, Checked Nov 75, Revision E March 76. | 1 | |
22:02, 16 July 2014 | Stage 1 Works Instructions.pdf (file) | 3.84 MB | Daniel Evans | Detailed arrangements for staff and equipment involved in Stage 1 of Swindon MAS | 1 | |
22:08, 5 June 2014 | Uffington Locking Sketch 1976.pdf (file) | 3.63 MB | Danny | BR(W) Uffington Locking Sketch, S277/2, Drawn Feb 76, Checked July 76. | 1 | |
22:07, 16 July 2014 | Stage 3 Works Instructions.pdf (file) | 3.61 MB | Daniel Evans | Detailed arrangements for staff and equipment involved in Stage 3 of Swindon MAS | 1 | |
22:52, 5 June 2014 | Wootton Bassett East Locking Sketch 1977.pdf (file) | 3.59 MB | Danny | BR(W) Wootton Bassett East Locking Sketch, S306/2, 1977. | 1 | |
00:09, 6 June 2014 | S2498.pdf (file) | 3.33 MB | Danny | Signalling notice S.2498. Swindon: Stage 1 Uffington to Highworth Junction | 1 | |
19:48, 8 June 2014 | S2576.pdf (file) | 3.32 MB | Danny | Signalling Notice - S.2576 - Swindon: Preliminary Stage 7 | 1 | |
23:09, 5 June 2014 | Kemble Locking Sketch 1981.pdf (file) | 3.26 MB | Danny | BR(W) Kemble Locking Sketch, S332/2, 1981. | 1 | |
23:03, 5 June 2014 | Wootton Bassett West Locking Sketch 1974.pdf (file) | 3.25 MB | Danny | BR(W) Wootton Bassett West Locking Sketch, S308/2, 1974 | 1 | |
22:39, 5 June 2014 | Highworth Locking Sketch Version B 1983.pdf (file) | 3.14 MB | Danny | BR(W) Highworth Locking Sketch, S283/2, Revision B 1983 | 1 | |
22:44, 16 July 2014 | Route Lists.pdf (file) | 3.09 MB | Daniel Evans | A list of signal routes for the initial scheme plan of the Swindon MAS Scheme, detailing destination, route type, and indications given. Dated Aug 1965. | 1 | |
23:11, 5 June 2014 | Swindon Route Setting Charts 1982.pdf (file) | 3.03 MB | Danny | Swindon interlocking area Route Setting Charts 1982. S296/17 | 1 | |
23:00, 5 June 2014 | Thingley Junction Locking Sketch 1978.pdf (file) | 2.77 MB | Danny | BR(W) Thingley Junction Locking Sketch, 1978. | 1 | |
17:45, 20 July 2014 | SP64525Sheet4Part3.PDF (file) | 2.68 MB | Matthew Callaghan | SP64/525 SWINDON Proposed Colour Loght Signalling Diagram (part 3) | 1 | |
21:18, 18 July 2014 | Progress Meeting 20.pdf (file) | 2.39 MB | Daniel Evans | The minutes of Swindon MAS Progress Meeting No. 20, held at Reading on 19/09/66. Discusses progress and target dates for the project. (7203) | 1 | |
22:15, 16 July 2014 | Stage 6 Notice Requisition.pdf (file) | 2.19 MB | Daniel Evans | Request for resignalling notice to be published in connection with Stage 6 of Swindon MAS | 1 | |
19:38, 8 June 2014 | S2517map.pdf (file) | 2.17 MB | Danny | Signalling Notice S.2517 - Swindon: Stage 4 Wootton Bassett West to Badminton - Map | 1 | |
19:53, 14 June 2014 | LXO77.pdf (file) | 2.12 MB | Danny | Signalling Notice - LXO.77 - Wantage Road - Uffington | 1 | |
19:58, 8 June 2014 | S2668.pdf (file) | 1.89 MB | Danny | Signalling Notice - S.2668 - Multiple Aspect Signalling Gloucester (Stage 9 - Kemble - Standish Junction) | 1 | |
22:26, 5 June 2014 | Bourton Locking Sketch 1983.pdf (file) | 1.88 MB | Danny | BR(W) Bourton Locking Sketch, S280/2, Drawn June 74, Revision E, July 1983. | 1 | |
21:38, 16 July 2014 | Aspect Sequence Up Main.pdf (file) | 1.82 MB | Daniel Evans | Up Main Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
20:03, 8 June 2014 | 43W2715.pdf (file) | 1.8 MB | Danny | Signalling Notice - 43/W/2715 - Swindon Swindon (Wootton Bassett) to Bristol (Westerleigh Jcn.) Resignalling | 1 | |
20:22, 8 June 2014 | S2545.pdf (file) | 1.77 MB | Danny | Signalling Notices - S.2545 - Swindon: Preliminary Stage 5 | 1 | |
15:51, 16 November 2014 | No33-D1.jpg (file) | 1.76 MB | Danny | 1 | ||
15:52, 16 November 2014 | No33-D2.jpg (file) | 1.76 MB | Danny | 1 | ||
19:47, 19 August 2014 | Wootton Bassett West 2.pdf (file) | 1.67 MB | Matthew Callaghan | 1 | ||
22:56, 5 June 2014 | Chippenham Locking Sketch 1978.pdf (file) | 1.6 MB | Danny | BR(W) Chippenham Locking Sketch, S318/2, 1978. | 1 | |
21:40, 16 July 2014 | Aspect Sequence Down Main.pdf (file) | 1.48 MB | Daniel Evans | Down Main Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
15:50, 16 November 2014 | No33-T.jpg (file) | 1.43 MB | Danny | 1 | ||
22:35, 5 June 2014 | Highworth Locking Sketch Version A 1976.pdf (file) | 1.37 MB | Danny | BR(W) Highworth Locking Sketch, S283/2, Revision A 1976 | 1 | |
19:47, 19 August 2014 | Wantage Road - 2a.pdf (file) | 1.34 MB | Matthew Callaghan | 1 | ||
20:50, 5 August 2014 | UM73.jpg (file) | 1.2 MB | James Nelhams | Photo by Danny Scroggins | 1 | |
21:42, 16 July 2014 | Aspect Sequence Up Gloucester.pdf (file) | 1.14 MB | Daniel Evans | Up Gloucester Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
22:25, 16 July 2014 | MAS Scheme information.pdf (file) | 1.13 MB | Daniel Evans | A short two-page summary of the Swindon MAS scheme, dated 7th Dec 1964. | 1 | |
21:42, 16 July 2014 | Aspect Seauence Down Badminton.pdf (file) | 1.11 MB | Daniel Evans | Down Badminton Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
22:44, 16 July 2014 | MAS Scheme Statistics.pdf (file) | 1.09 MB | Daniel Evans | Statistics relating to signalling equipment in the Swindon MAS Scheme. Undated. | 1 | |
14:04, 14 April 2015 | Domino Map.pdf (file) | 1.09 MB | Danny | 1 | ||
21:41, 16 July 2014 | Aspect Sequence Up Badminton.pdf (file) | 1.08 MB | Daniel Evans | Up Badminton Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
19:56, 8 June 2014 | S2643.pdf (file) | 1.08 MB | Danny | Signalling Notice - S.2643 - Signal alterations at Swindon, etc | 1 | |
21:42, 16 July 2014 | Aspect Sequence Down Gloucester.pdf (file) | 1.06 MB | Daniel Evans | Down Gloucester Aspect Sequences for initial scheme plan, dated Dec 1965. | 1 | |
20:12, 8 June 2014 | 2722Letter.pdf (file) | 993 KB | Danny | Letter requesting the issue of notice 43/W/2722 | 1 | |
19:18, 13 March 2020 | 1983-02-diagram.png (file) | 902 KB | Swindonpanel | 1 | ||
19:16, 13 March 2020 | 1983-02.png (file) | 870 KB | Swindonpanel | 2 |