User contributions for Daniel Evans
Jump to navigation
Jump to search
18 July 2014
- 21:4221:42, 18 July 2014 diff hist +93 m Sources - Other Documents Extra Link
- 21:4121:41, 18 July 2014 diff hist +800 Swindon MAS Stages Additional documents and rearrangement of links current
- 21:2521:25, 18 July 2014 diff hist +372 N File:SN59 Issues.pdf Two letters between A.A.A. Cardani, CS&TE (WR), and H C Sanderson, Movements Manager (Paddington), discussing the deficiency in braking distance for signal SN.59, which S&T believes not to be a significant issue, whilst the Traction department believe ... current
- 21:1821:18, 18 July 2014 diff hist +140 N File:Progress Meeting 20.pdf The minutes of Swindon MAS Progress Meeting No. 20, held at Reading on 19/09/66. Discusses progress and target dates for the project. (7203) current
- 21:1621:16, 18 July 2014 diff hist +254 N File:Level Crossings Proposed Arrangements.pdf Document covering the proposed arrangements for level crossings in the Swindon MAS Scheme, an estimate for track circuiting the line between Thingley and Bradford Junctions, and a proposal to fit AWS on the Swindon-Gloucester line. Dated 16/08/65. (7203) current
- 21:1421:14, 18 July 2014 diff hist +197 N File:Letter to Cardani from Westinghouse.pdf Letter from T J Aldridge of Westinghouse Brake and Signal Co Ltd to Armand Cardani, CS&TE, Western Region, discussing tenders for equipment related to the Swindon MAS Scheme. Dated 08/02/66. (7203) current
- 21:1221:12, 18 July 2014 diff hist +193 N File:Estimated Costs.pdf List of estimated costs for extensions/fringes to the original Swindon MAS scheme scope, including Swindon-Standish Jn, Thingley Jn-Bradford Jn, and Westerleigh Junction. Dated 17/03/65. (7203) current
- 21:1021:10, 18 July 2014 diff hist +78 N File:Envelope to Cardani.pdf Envelope addressed to A. A. A. Cardani, CS&TE, Western Region. Undated. (7203) current
- 21:0921:09, 18 July 2014 diff hist +111 N File:Deficient Distant Signals.pdf List of signals with deficient (less than standard) braking distance in the Swindon Panel area. Undated. (7203) current
16 July 2014
- 23:0423:04, 16 July 2014 diff hist +119 m Interlockings Remote interlockings link
- 22:5922:59, 16 July 2014 diff hist −11 m Swindon MAS Stages Reworded some links
- 22:5622:56, 16 July 2014 diff hist +66 m Sources - Other Documents Extra link
- 22:5222:52, 16 July 2014 diff hist +23 m Sources - Other Documents Formatting
- 22:5222:52, 16 July 2014 diff hist +40 m Sources - Other Documents Aspect Sequence link
- 22:5122:51, 16 July 2014 diff hist +10 m Swindon MAS Stages Formatting
- 22:5022:50, 16 July 2014 diff hist +879 Swindon MAS Stages Scheme planning documents added
- 22:4422:44, 16 July 2014 diff hist +152 N File:Route Lists.pdf A list of signal routes for the initial scheme plan of the Swindon MAS Scheme, detailing destination, route type, and indications given. Dated Aug 1965. current
- 22:4422:44, 16 July 2014 diff hist +79 N File:MAS Scheme Statistics.pdf Statistics relating to signalling equipment in the Swindon MAS Scheme. Undated. current
- 22:4222:42, 16 July 2014 diff hist +69 N File:Swindon MAS Index.pdf An index to a series of documents covering the Swindon MAS proposals. current
- 22:4022:40, 16 July 2014 diff hist +327 N File:Signalling Scheme Info.pdf A detailed report covering the Swindon MAS Scheme. Includes a background and justification for the scheme and other MAS schemes in the Western Region (including an unbuilt Stoke Gifford panel box), the proposed features of the Swindon MAS scheme, a fin... current