SN.897

From Swindon Panel Reference
Revision as of 12:37, 24 August 2014 by Danny (talk | contribs) (2000 commissioning added)
Jump to navigation Jump to search

Back to Control Functions.

This signal was newly installed in connection with the South Marston connection described in GWS.15 and GWS.27.

First Attempt

The signal was planned to be brought into use on 14 February 2000, as described in GWS.15. However, the work was not brought into use due to 'construction difficulties':

WON-2000-03.png

Second Attempt

The signal was planned to be brought into use on 11 and 18 January 2002.

WON-2002-02.png

and

WON-2002-03.png

but wasn't....

WON-2002-04.png