SN.81 became a controlled signal, previously [[UM.75]] at 0645 on Sudnay 11 June 2000, in connection with the installation of the connection to South Marston Euroterminal.
SN.81 became a controlled signal, previously [[UM.75]] at 0645 on Sudnay 11 June 2000, in connection with the installation of the connection to South Marston Euroterminal.


[[File:WON-2000-01.png]]
[[File:WON-2000-01.png | border]]


----
----
Line 7: Line 7:
The signal ATP loop was published as disconnected for two weeks from 04.50 on Monday 14 January 2002. (A ironic entry considering how many ATP loops were out of use for months or years!)
The signal ATP loop was published as disconnected for two weeks from 04.50 on Monday 14 January 2002. (A ironic entry considering how many ATP loops were out of use for months or years!)


[[File:WON-2002-01.png]]
[[File:WON-2002-01.png | border]]

Revision as of 12:02, 24 August 2014

SN.81 became a controlled signal, previously UM.75 at 0645 on Sudnay 11 June 2000, in connection with the installation of the connection to South Marston Euroterminal.

WON-2000-01.png


The signal ATP loop was published as disconnected for two weeks from 04.50 on Monday 14 January 2002. (A ironic entry considering how many ATP loops were out of use for months or years!)