Down Sidings Ground Frame: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Back to [[Control Functions]] | Back to [[Ground Frames|list of Ground Frames]]
[[File:Down_Siding_GF.jpg|thumb|400px|right|The Down Siding GF. ''(Photo by Danny Scroggins)'']]
[[File:Down_Siding_GF.jpg|thumb|400px|right|The Down Siding GF. ''(Photo by Danny Scroggins)'']]
==Description==
==Description==

Latest revision as of 02:23, 7 January 2017

Back to Control Functions | Back to list of Ground Frames

The Down Siding GF. (Photo by Danny Scroggins)

Description

The ground frame worked 346 points, the trailing connection in the Down Goods from the Down Through Siding at Swindon West.

The ground frame was mechanical throughout its life.

Origin

The ground frame was provided when a new connection was provided from the Down Siding at the same time as the Down Relief was de-passengerised and converted to a Down Goods between 1 and 8 May 1976[1]

Abolition

The ground frame was abolished when the points were removed, after a long period of disuse, from 05.15 on Monday 12 December 2011:

WON-2011-01.png

References

  1. Signalling Notice 43/W/2722