DM.67: Difference between revisions

From Swindon Panel Reference
Jump to navigation Jump to search
(Signal numbers table altered)
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:DM67.jpg|thumb|300px|right|DM67 Signal]]
[[File:DM67crop.jpg|thumb|300px|right|DM67 Signal ''(Photo by Danny Scroggins)'']]


==Origin==
==Origin==


DM.67 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB.
DM.67 was a 4-aspect automatic signal commissioned at [[Swindon MAS Stage 1]] on 14 November 1966<ref name="S.2498">Signalling Notice [[S.2498]]</ref>. At that stage it was supervised by [[Uffington]] SB.


{| class="wikitable"
{| class="wikitable"

Latest revision as of 20:42, 5 August 2014

DM67 Signal (Photo by Danny Scroggins)

Origin

DM.67 was a 4-aspect automatic signal commissioned at Swindon MAS Stage 1 on 14 November 1966[1]. At that stage it was supervised by Uffington SB.

Previous Signal Line Line Next Signal
UF.32 Down Main Down Main DM.68
UF.4 Down Goods Loop

Controlled passed to Swindon Panel under Swindon MAS Stage 5 on 3rd March 1968.

Previous Signal Line Line Next Signal
SN.10 Down Main Down Main DM.68

Conversion to Automatic

This signal was converted to an automatic (from what?) on 2 August 1970:

SN Won AKOverton-1.jpg

The signal is shown as already an automatic in the resignalling notice S.2498, so unknown what it was converted to an automatic from...


References

  1. Signalling Notice S.2498