SN.22

From Swindon Panel Reference
Jump to navigation Jump to search

Back to Control Functions

Origin

...


Alterations in connection with Reversible Signalling

From 6 March 1977 the signal was mounted on a right-hand cantilever, in readiness for the future installation of SN.624R.

1977-03.png

The reversible signalling was brought into use in 1981 [1].

Capability to flash double yellow

The signal was given the capability to flash double yellow in May 1988, when the next signal, SN.24, was showing a flashing single yellow, and the following signal SN.28, was cleared towards platform 3.

1988-01.png


References

  1. Signalling Notice 31/2766