Ashbury Up Siding Ground Frame

From Swindon Panel Reference
Jump to navigation Jump to search

Back to Control Functions | Back to list of Ground Frames

The ground frame controlled a trailing siding connection in the Up Main. It was protected by semi-automatic signal UM.71.

It was installed under Swindon MAS Stage 1 on 12 November 1966[1] and was released by Uffington signal box.

When Uffington SB closed at control over the release passed to Swindon Panel in Swindon MAS Stage 5.